Southern Regional Water Pipeline – a two way bulk water pipeline connecting Brisbane to the Gold Coast and moving water to where it is most needed through Ipswich, Logan and Beaudesert.
More than 2.5 million man hours, the laying of 94 km of pipe and construction of associated infrastructure,
which included five pump stations, 10 tunnels, five elevated crossings, 25 auger bore crossings, four balance tanks and three water treatment facilities.
CGS were enlisted to assist with the required survey on this project.